CARBOTURA
Carbotura Advanced Circular Manufacturing · Engagement Package

North Alabama
Industrial Corridor

A 30-year Build-Own-Operate Circular Offtake Agreement converting Nucor's Southeast ASR stream from a $10.95M/year disposal liability into a net cash-positive royalty relationship from Month 13 — with zero counterparty capital obligation.

Stage 1 — Discovery Confidential · Authorized Recipients Only Decatur, Alabama · Morgan County April 2026
Carbotura · Advanced Circular Manufacturing · Community Overview
~360
TPD Addressable ASR
$150
TMC Fee / Ton
$180
Year 2 Royalty / Ton
$0
Counterparty CapEx
192
Direct FTE — Expanded
30yr
COA Term
Six Documents · One Decision
Engagement Document Suite
Document 01 of 06
Waste Feedstock Study
Diagnostic analysis of Nucor and DJJ's Southeast ASR stream — volumes, cost structure, regulatory classification, and addressability assessment. Establishes State A baseline.
~360 TPD ASR $75/ton FWDC RCRA Risk
Open document ↗
Document 02 of 06
Proposal
Transaction structure: 30-year BOO COA, $150/ton TMC Fee, Circular Royalty commencing Month 13. Site candidate analysis — Priority 1 at Morgan County Industrial District, Decatur AL.
$150/ton TMC $180/ton Royalty Yr2 P1 — Decatur AL
Open document ↗
Document 03 of 06
Economic Impact Report
Delta model quantifying State A vs. State B across all three fiscal periods: pre-royalty, royalty ramp, and steady state. Risk register, FWDC sensitivity, RCRA sign-change threshold.
+$101.25/ton Yr2 FWDC Sensitivity 30yr Projection
Open document ↗
Document 04 of 06
Executive Brief
Two-minute action instrument for decision-makers. The live operational condition, fiscal period breakdown, cost of delay, and one required action — Community Feasibility Study authorization.
Action Instrument Month 13 Royalty 2-Min Read
Open document ↗
Document 05 of 06
SPV Finance
Institutional capital structure: $75M–$247.5M BOO facility financing. Option B asset base (PP&E + COA Reserve + IP License). Debt schedule, DSCR, investor returns, and 30-year FCF. US GAAP.
$247.5M Expanded 65% Project Debt US GAAP
Open document ↗
Document 06 of 06
Community Benefits
Plain-language guide to ACM for Morgan County — what it is, what it does, how the Circular Royalty works, and what it means for North Alabama jobs, economy, and environment.
192 Direct Jobs $80.6M Impact Morgan County
Open document ↗
Decision Window — Action Required

Active ASR disposal contracts govern Nucor and DJJ's current $10.95M/year landfill arrangement. Their expiry dates are undisclosed. Understanding those windows is the first deliverable of the Community Feasibility Study — and the clock is running. At 400 TPD, each quarter of delay defers $6.3M in combined royalty and avoided disposal value versus the State B position. RCRA Subtitle C reclassification — which could step-change disposal costs to $250/ton — remains open while disposal contracts remain active.

$6.3M
value deferred per quarter
of Feasibility Study delay
(Expanded — 400 TPD)
Read the Brief ↗
Planning basis: Volume, cost, and financial figures in this engagement package are based on estimated inputs identified by ESTIMATED badges throughout each document. FWDC of $75/ton and ASR volumes of 100/200/400 TPD require verification through a Community Feasibility Study. This package is prepared for authorized recipients of a Stage 1 Carbotura discovery engagement and does not constitute financial, legal, or investment advice. US GAAP. April 2026.